• Call Us Now : +91-9555815810

    |
  • info@landfather.com

    |

DMRC faces biggest challenge during Delhi metro’s Phase-III expansion

DMRC faces biggest challenge during Delhi metro’s Phase-III expansion

“The Pink Line, in particular, intersects existing corridors at 11 locations — DMRC reached a new milestone when the Pink Line was constructed above the Airport Express Line and the pillars rose up to 23 metres, the highest point touched till date. “The Phase-III project was much more challenging than the previous two in the context of engineering challenges,” DMRC spokesman Anuj Dayal said”

© Copyrights 2017 Landfather. All Rights Reserved.

Powered by Land Father.